An independent investigator hired by the state found the Addison County natural gas pipeline to be โgenerallyโ in compliance with state and federal requirements with a few exceptions.
In a report filed Wednesday with the state Public Utility Commission, the investigator confirmed that construction plans for the Addison County natural gas pipeline were not stamped by a professional engineer and that parts of the pipeline under a swamp were not buried as far as required.
But the report also says that Vermont Gas โwas diligent in their effortsโ to comply with state regulators and federal safety regulations, often exceeding those standards.
Three months after the pipeline was completed in April 2017, the state Public Utility Commission began looking into claims that the pipeline was not buried deep enough. The stateโs Agency of Natural Resources and Department of Public Service requested last year to expand the investigation into pipeline construction methods and operation.
James Dumont, an attorney representing five Monkton and Hinesburg residents who oppose the pipeline, filed a motion in November 2018 to expand the investigation further to assess whether a professional engineer had signed off on the pipeline construction plans.
The $165 million pipeline runs 41 miles from Colchester to Middlebury, where natural gas is injected into the companyโs smaller, low-pressure distribution lines and carried to customers.
The exhaustive report is a critical component for the PUC’s decision, but the investigation is far from over.
Mike Tousley, PUC hearing officer for the case, said the commission will convene a hearing about whether Vermont Gas violated its certificate of public good after an opportunity for further rounds of discovery. The commission will then decide whether to levy penalties against the utility.
The commission brought in William Byrd, of RCP Inc., a Houston-based engineering firm, to independently investigate the Addison County pipeline. Byrd was tasked with looking at whether the utility had followed all the requirements of its state-issued certificate of public good, buried the pipeline deep enough at stream crossings and swampy ground, and whether it had received a professional engineerโs stamp, among other tasks.
Separately, the Department of Public Service issued a notice of probable violation in 2016 over worker safety requirements for the portion of the pipeline built in an electrical transmission corridor, for which the utility paid $95,000. And the department issued another notice of probable violation regarding pipeline burial and trench breaker installation in 2018 that is still open pending the results of this investigation.
Byrd, having reviewed thousands of pages of inspection reports, said in his report that the pipeline was โthoroughly and competently designed and engineeredโ with comprehensive inspection by multiple parties.
โWith a few noted exceptions, it was constructed in compliance with applicable rules and commitments, and in many important respects it significantly exceeds the typical requirements,โ he wrote.
One exception was that the pipeline construction plans were not stamped by a professional engineer at the time of construction — as required by state law. The National Transportation Safety Board review of the Lawrence, Massachusetts, natural gas explosions recommended that professional engineers stamp pipeline plans.
But Byrd said in his report that the plans had been prepared by and under the supervision of Vermont engineering firms.

โI have seen no evidence that the engineering or design work for the ANGP was deficient, was not performed by competent engineers, or posed a risk to ‘public health, safety, and welfare,โโ he wrote.
Byrd stated that the pipeline had been adequately buried at stream crossings but was not buried at the mandated 4 feet in a transmission right of way through a clay plain swamp in New Haven. However, he wrote that an engineering analysis of the pipe in that section show that VELCO trucks should still be able to safely drive over it.
The investigator had seven recommendations for the utility, including installing warning signs about the โshallow pipeโ by the transmission corridor, three-year inspections of the pipe depth in agricultural areas, and inspection of the 15 road crossing for evidence of frost heaves or potholing that could impact the pipeline.
Don Rendall, CEO of Vermont Gas, in a prepared statement said that the utility was โso pleased that the Public Utility Commissionโs independent expert investigation validates the work VGS has done to construct a safe, quality pipeline to Addison County.โ He added that the investigatorโs recommendations, along with the companyโs pipeline management plans, will continue to ensure safety into the future.

Dumont, attorney for the intervenors, said Byrdโs report differed dramatically from an assessment by Charlotte-based Liebert Engineering, whom the plaintiffs hired to review the matter.
โThe PUC order approving of the whole pipeline said explicitly, you shall build the pipeline in accordance with the plans you gave us,โ he said. โAnd what we saw time and again, regardless of whether itโs a safety issue or not a safety issue, they didnโt follow the plans they submitted to the PUC.โ
Jim Porter, director of public advocacy for the Department of Public Safety, said that while the department was still reviewing the report, the investigator had examined โevery issueโ brought by the intervenors and other parties.
โWe very much think that the report speaks for itself in underscoring the safety of the pipeline and the integrity with which it was constructed,โ he said.