In re Bombardier, 2018 VT 11
Hereโs another blast from the past. This case is about a professional engineerโs required standards of conduct when inspecting a home for an insurance claim.
Naturally, this reminds me of a humorous saying about engineers. The optimist sees the glass as half full. The pessimist sees the glass as half empty. The engineer sees the glass as twice as big as it needs to be. This has little to do with the case, but when have we ever let that get in the way of mildly related humor? That’s right: never.
In 2014, an insurance adjuster hired Gregory Bombardierโa licensed professional engineerโto take a look at Rand Larsonโs property. Mr. Larson had filed a claim against a plumbing and heating company because he believed that when the plumbing and heating company notched one of the support beams in his house, it caused the floor to buckle.
Mr. Bombardier showed up when Mr. Larson was away. There was some remedial shoring work in progress and Mr. Larsonโs contractor was at the property. The remedial shoring work is important in this case because it included sonotubes intended to support a skirt, but those sonotubes did not provide foundational support for the house itself. The house itself was mostly cantilevered construction.
Well, Mr. Bombardier assumed that the sonotubes were foundational elements. He looked at the notched beam through a hole in the floor from above. He didnโt see any cracking or splintering. He didnโt observe the notched beam from below. Based on his inspection, he concluded that the floor settling was due to the sonotubes settling and not from the notched beam.
Mr. Larson hired his own engineer. That engineer said the floor settling was due to the notched beam. Mr. Larson asked Mr. Bombardier for a reinspection. Mr. Bombardier didnโt respond. The insurance company sent Mr. Bombardier a copy of the other engineerโs report and Mr. Bombardier told the insurance company that nothing in it changed his opinion. The insurance company denied the claim.
Mr. Larson got ticked off. He wrote Mr. Bombardier an email โthreatening to sue him and to file a professional complaint against him if he โcontinue[d] to fail to consider the irrefutable proof that we hold that totally refutes your conclusions!โโ Mr. Larson then filed a professional complaint against respondent.
The Office of Professional Responsibility (OPR) brought charges of unprofessional conduct against Mr. Bombardier, asserting that Mr. Bombardierโs inspection was deficient and that โ when faced with conflicting opinions from other knowledgeable tradespeople and professionals โ Mr. Bombardier should have reviewed or revised his opinion.
The Board didnโt ding Mr. Bombardier for not reviewing or revising his report, but it did find that his inspection was unprofessional. He would have been OK if heโd only signed up to rule out the plumbing and heating contractorโs work as the cause of damage. Instead, he agreed to a much broader scope of work. The Board found Mr. Bombardierโs inspection deficient because he didnโt ask Mr. Larson about the houseโs history; he didnโt ask the on-site contractor about the prior renovations and ongoing remedial work; he had limited observation of the framing; he drafted a minimally noted framing plan; he didnโt really check out the notched beam fully. There was a bunch more. โYadda, yadda, yadda.โ
So, the Board concluded that Mr. Bombardier โfailed to conform to the essential standards of acceptable and prevailing practiceโ because he didnโt do a proper inspection. He was reprimanded and dinged with a $1,000 fine.
Mr. Bombardier appealed to an administrative officer, who did an on-the-record review and affirmed.
Mr. Bombardier appeals.
SCOV notes it โwill affirm the Board’s findings as long as they are supported by substantial evidence, and its conclusions if rationally derived from the findings and based on a correct interpretation of the law.โ SCOV also gives additional deference in this type of review-by-peers situation.
Mr. Bombardier first argues that the charges against him are unfair and against the purpose of the disciplinary rules because the complaint was initiated by Mr. Larson. He points out that his actual client was the insurance company. SCOV reasons that this matters not. Itโs within OPRโs discretion whether to bring charges. โOne does not need to be a client, or to suffer actual harm, in order to file a complaint against a license holder.โ
SCOV notes that โwhether a professional engineer has engaged in unprofessional conduct does not turn on whether a client is upset or has filed a complaint.โ An engineer and client can limit the scope of work and thatโs fine. Likewise, the fact that an aggrieved party can sue an engineer for damages doesnโt โobviate the engineerโs independent duty to avoid unprofessional conduct nor does it deprive the Board of its statutory authority to address such conduct.โ
SCOV reasons that while the disciplinary rules shouldnโt be used to settle private disputes, thatโs not what happened here. Thereโs no indication that Mr. Larsonโs email influenced the Board. OPR investigated the complaint, concluded charges were warranted, and found five separate reasonsโsupported by multiple pointsโwhy Mr. Bombardierโs inspection and engineering work was deficient and fell below the acceptable standard. Because Mr. Bombardier didnโt directly challenge the Boardโs findings, and the Boardโs findings support its conclusions, we can see where SCOV is headed. And we donโt need a crystal ball. SCOV rejects Mr. Bombardierโs public policy arguments.
Mr. Bombardier next argues he was deprived of basic due process because OPRโs specification of charges wasnโt about his failure to do a thorough investigation or sufficiently document his investigation. He argues he wouldโve introduced other evidence if he knew he was going to get dinged for these shortcomings.
SCOV finds no error. Notice in an administrative proceeding only needs to be reasonable. And here, SCOV reasons, the notice was reasonable. First off, there were specific allegations about Mr. Bombardierโs conduct during the inspection in the statement of facts for the specification of charges. SCOV reasons that Mr. Bombardier was given โsufficient factual background to put him on notice that he was alleged to have committed unprofessional conduct during his … inspection.โ Additionally, there was a lot of discussion of the report during the hearing. There wasnโt any objection to a board memberโs classification of the report as the โheartโ of the matter. All in all, SCOV reasons that Mr. Bombardier was given โan adequate opportunity to prepare and respond to the issues raised in the proceeding.โ SCOV rejects the due-process argument.
SCOV quickly disposes of Mr. Bombardierโs the-Board-misapprehended-my-undertakingโs-scope argument. SCOV points out that Mr. Bombardier repeatedly testified during the hearing that the scope of work he agreed to was broad.
Mr. Bombardier will have to take his reprimand and pay his fine. SCOV affirms.